ISO 14067 What is the product carbon footprint? From life cycle boundaries to result communication

Quick answer

Understand the functional units, system boundaries, life cycle data, allocation methods and verification preparations of ISO 14067 product carbon footprint.

Author: StartrustPublished: Updated:

Product carbon footprint is the conversion of greenhouse gas emissions caused by a product or service at each stage of its life cycle into carbon dioxide equivalents. ISO 14067 provides principles and requirements for quantification and reporting, and is consistent with the life cycle assessment concepts of ISO 14040 and ISO 14044.

First define the research objects and functional units

Product names are insufficient as a basis for comparison. Businesses need to clearly state whether they are counting a kilogram of material, a product, a service, or a function provided under specific conditions of use. Functional units affect the conversion of all data and determine whether the results are meaningful.

The system boundary determines where to count

Common boundaries may cover raw material acquisition, manufacturing, transportation, sales, use and the end of the life cycle, and may also take part of the carbon footprint depending on the purpose. Any stages not included must be justified and cannot be simply ignored simply because the information is difficult to obtain.

What information is needed for product carbon footprint?

  • Product formula, BOM and raw material weight.
  • Raw material suppliers and origins.
  • Process electricity, fuel, steam, water and losses.
  • Output, yield and shared equipment operating data.
  • Packaging materials, transportation distance and means of transport.
  • Energy and consumables during use phase.
  • Recycling, incineration, landfill or other end-of-pipe disposal situations.

Shared processes need to be allocated reasonably

The same production line may produce multiple products, and energy and materials cannot be directly attributed. Companies should prioritize physical relationships, such as weight, hours, output, or energy; if economic value or other methods are used, the reasons for their selection should also be explained and used consistently.

How to match primary and secondary information?

Actual data should be used first for self-owned processes and controllable activities; when there is a lack of supplier data for upstream raw materials, appropriate databases or literature coefficients can be used, but the year, region, technical representativeness and limitations must be recorded. High-emitting raw materials should be listed as a priority project to improve the quality of primary data in the future.

The results cannot be used to compare products at will.

If two products have different functional units, boundaries, data sources, distribution methods or usage scenarios, the carbon footprint figures cannot be directly compared. For external comparison or labeling, common product category rules and communication requirements are usually required.

What does ISO 14067 not address?

The standard focuses on the environmental impact of climate change. It does not mean that the product is necessarily better in terms of water, toxicity, resources or society; nor does carbon offset and external communication equal the quantification of the product’s carbon footprint itself.

Management value after import

Product carbon footprint should be more than just a number. After splitting the results into raw material, process, transportation and use stages, companies can identify hot spots and evaluate material substitution, process improvement, packaging reduction and supplier cooperation. What is truly valuable is product carbon data that can be continuously updated, rather than a one-time calculation report.

What should companies prepare before importing or adopting?

Enterprises should not start directly from the articles or questionnaires, but should first confirm the purpose of introduction, scope of application, expected deliverables and external deadlines. Then take stock of the existing systems, data sources, responsible departments and review processes to find out the current capabilities and real gaps. If you face customers, regulations, disclosure and verification requirements at the same time, you must first confirm whether the boundaries and nouns used by them are consistent.

It is recommended to complete at least the following preparations:

  • Designate project leaders and cross-department windows.
  • Confirm applicable companies, sites, products or scope of activities.
  • Establish a list of necessary information, documents and evidence.
  • Inventory of existing policies, procedures, forms and information systems.
  • Confirm external validation, evaluation or customer delivery deadlines.
  • Design version, permissions, review and exception handling methods.

How to arrange cross-department division of labor?

The sustainability or management system team can be responsible for standard interpretation and overall coordination, but cannot provide information for all departments. Senior managers are responsible for direction and resources; operating units confirm processes and actual controls; finance provides cost and organizational information; procurement and supply chain management external information; information units maintain authority and systems; internal audit or legal affairs assists in checking systems and regulatory risks.

In addition to listing the person in charge, the division of labor table should also include delivery content, frequency, reviewers, and overdue processing. This prevents the project from relying on the memories of a small number of contractors.

Common import errors

Only to obtain certificates or complete customer requirements

If the system does not include procurement, operations, investment and personnel management, documents will still be temporarily added before the audit, and it will be difficult to continue to improve after the results are obtained.

Move existing forms online intact

Before digitization, fields, definitions, responsibilities and review rules must be unified, otherwise it will just turn scattered chaos into online chaos.

All data require the highest accuracy

Resources should be allocated based on materiality and risk. Key projects use more rigorous primary data and review, while low-risk projects adopt reasonable methods and explain limitations.

The file is written completely, but I don’t know how to execute it on site.

Procedures should respond to actual work, and the effectiveness of the system should be confirmed through training, trials, internal audits and management reviews.

Which enterprises or usage scenarios is it suitable for?

  • An explicit request has been received from the customer, the group or the competent authority.
  • Multi-site or cross-department data lacks unified caliber for a long time.
  • The existing system relies on Excel, Email and personal experience.
  • Be prepared to undergo third-party verification, evaluation or audit.
  • Looking to transition annual delivery work into day-to-day management.
  • The need for consistent data to support decision-making and continuous improvement.

How to check the import effect?

In addition to whether the verification is completed, the data punctuality rate, missing rate, number of returns, abnormal improvement time, review preparation time, and management decision-making usage should also be observed. Whether the system can continue to operate in the next year usually reflects the quality of the introduction better than whether the first delivery went smoothly.

From understanding the requirements to actual implementation, it can be divided into four stages.

The first stage is to define the purpose. Enterprises must first confirm whether the introduction of this standard is to respond to customer requirements, establish internal management systems, prepare for third-party verification, or support sustainability reporting and reduction decisions. Depending on the purpose, the depth of data, participating departments, and schedule will also be different. If the goal is only written as “obtaining certificates” at the beginning, the implementation process will easily focus on documents and ignore whether the system can continue to operate.

The second stage is to take stock of the current situation. In addition to confirming the existing forms and operating procedures, it is also necessary to find out who generated the data, at what point in time it was obtained, who reviewed it, and what current gaps there are. Many companies do not have no data at all, but the data is scattered in different departments, and the definitions and versions are inconsistent. Drawing the current situation into a process first can help you better identify areas that really need improvement than adding a large number of forms at once.

The third stage is to establish the system and pilot it. Enterprises can first select a factory, product or management unit to test to confirm whether the rights and responsibilities, calculation logic and document hierarchy are reasonable, and then gradually expand. The discovery of problems during the pilot does not mean that the system has failed, but it can prevent errors from being replicated throughout the organization. At this time, the basis for judgment, exception handling and change records should also be kept simultaneously so that subsequent audits can be traced.

The fourth stage is regular review. Standardized management is not a one-time project. Enterprises still need to continuously confirm whether the system is effective through internal audits, management reviews, performance indicators and corrective measures. When organizational boundaries, equipment, suppliers or regulatory requirements change, information and procedures must be updated in a timely manner so that the system can keep up with actual operations.

Frequently asked questions when importing

Do I have to create all files from scratch?

Usually not required. Most of the existing procurement, equipment, quality, financial or environmental safety and health processes already contain data and control points that can be used. A more pragmatic approach is to first identify the gaps between the existing system and standard requirements, and then strengthen the missing rights and responsibilities, evidence and tracking methods. This not only reduces the import burden, but also makes it easier for colleagues to accept it.

Does having a system mean it can meet the standards?

The system can assist in centralizing data, controlling versions, retaining tracks, and producing reports, but it cannot determine management boundaries, materiality judgments, or division of responsibilities for the enterprise. Systems, talents, and tools need to be designed together so that there will not be a situation where “the system has data, but the site doesn’t know why it needs to be filled in.”

How complete should the first import be?

The point is not to make all the details the most complicated at once, but to first establish a basic structure that is executable, reviewable, and sustainable for improvement. Enterprises can prioritize areas with greater impact, more mature data, or higher external attention, and then deepen them year by year based on risks and resources.

Related resources

Browse all articles

Official references

Related knowledge articles

SemiconductorHow to distribute the carbon footprint of semiconductor products between manufacturing processes and energy emissions?

Is it enough to deal with the product carbon footprint if existing management or relevant information has been completed? For the semiconductor industry, the answer is often not that simple. The boundaries, methods and evidence of concern are not exactly the same for different standards, clients and management purposes. Product carbon footprint needs to define functional units and life cycle boundaries, and convert activity data in raw material, manufacturing, transportation, use and disposal stages into carbon dioxide equivalents. In the past, when the semiconductor industry dealt with the carbon footprint of its products, each unit would

AerospaceHow to manage material and process data for the carbon footprint of aerospace components?

The requirements for the aerospace industry from international OEMs, defense customers, certification units and multi-tier suppliers are gradually moving from policy commitments to specific data, calculation basis and improvement records. In terms of product carbon footprint, companies must not only hand over results, but also explain data boundaries, methods, division of responsibilities and evidence. If you wait until you receive a questionnaire or verification notice before reorganizing it every time, it is easy to have inconsistent versions, and it will be difficult to provide credible information within the deadline. When the aerospace industry used to deal with product carbon footprints

Food and beverageHow does food carbon footprint integrate raw material, production, packaging and transportation data?

During each customer questionnaire, annual inventory or audit period, food industry managers often need to reorganize raw material weight and origin, energy, refrigerant, water use, packaging materials, losses and logistics information. The real difficulty is usually not filling in the last number, but the scattered information, different calibers, and confirming who provided it, who reviewed it, and why the previous version was modified. In the past, when the food industry dealt with product carbon footprints, each unit often collected the weight of raw materials, origin, and energy according to their own forms and understandings.

Related consulting services

ISO 14067 Product Carbon Footprint / Carbon LabelView service detailsISO 14064-1 / GHG ProtocolView service details

Related system modules

Product Carbon Footprint ManagementView system moduleOrganizational GHG Inventory ManagementView system module